Inspection and Audits for Construction and Engineering

On site, every phase demands attention: from the safety of people working at height, in excavations or near the crane to workmanship quality, subcontractor control and the records the client asks for. Whether in buildings, bridges or urban works, each project has its particularities, but the commitment is the same: care and rigour in every check.

The essential points of attention on site, in a single app

On site, every phase demands attention: from the safety of people working at height, in excavations or near the crane to workmanship quality, subcontractor control and the records the client asks for. Whether in buildings, bridges or urban works, each project has its particularities, but the commitment is the same: care and rigour in every check.

01

Site safety

  • Daily check of collective protection and signage
  • Scaffold inspection before use and after changes
  • Excavations, trenches and shoring before each shift
  • Cranes, lifting operations and work at height

02

Workmanship quality

  • Material receipt and conformity
  • Hold points before pouring, closing or covering
  • Conformity of the work with the design
  • Tests, final checks and handover

03

Supervision and site records

  • Supervision visits with photos and signature
  • Site diary and daily occurrences
  • Measurement and progress validated on site
  • Surveys, reports and certificates for the client

04

Subcontractors and environment

  • Onboarding and work-front audits of subcontractors
  • Documents, training and fitness of each crew
  • Construction waste, dust and noise
  • Housekeeping and reinstatement when closing a front

On site, what was not recorded did not happen

If the inspector asked right now for last week's scaffold inspection, how long would your team take to find it? With Smart apps, every inspection is recorded on site, with photos, time and owner, ready to look up or demonstrate what was checked.

The site changes every day

Scaffold up, slab poured, trench open: what was safe yesterday may not be today. That is why inspection repeats, and every repetition has to be recorded.

Many companies, one record

Main contractor, subcontractors, supervisors and safety coordinators work on the same front. When each records in its own way, nobody can show the whole picture.

What gets covered has to be documented

Rebar before the pour, waterproofing before it is covered, pipework before the wall is closed. Afterwards, only the dated photo shows how it was done.

Evidence has to be at hand

The client audits, the labour inspector visits and the payment application depends on the record. Without the recorded inspection, the valuation stalls until someone chases it.

Inspector checks clamps, guardrails and toe boards on the scaffold
Inspector checks clamps, guardrails and toe boards on the scaffold
Safety technician inspects shoring and the access ladder of an excavation
Safety technician inspects shoring and the access ladder of an excavation

What happens after the finding is written down

Recording the issue is the easy part and almost everyone already does it. What fails is what comes next: who handles it, by when, with what evidence, and how anyone knows it will not come back.

The record arrives late

The inspection is jotted in the diary and written up at the end of the day in the site cabin. What was not photographed at the time is gone.

The action has no owner

It sits in site meeting minutes, in an e-mail or in a conversation on site. Without a named owner and a deadline, nobody answers for it.

Nobody chases the deadline

Chasing depends on someone remembering to go and check. Usually they remember the day the client asks.

The close has no evidence

Saying it was resolved is easy. Showing the state before, the action taken and the state after is another matter.

Nobody knows what repeats

Without a type and a cause, the same deviation shows up on three fronts and with two subcontractors and counts as five isolated cases.

Management asks and waits

How many open issues, for how many days and on which sites. The answer comes from phone calls to the foreman, not from the system.

Handwritten site diary and paper checklists on the site container desk
Handwritten site diary and paper checklists on the site container desk

What the law already requires of every site

In Brazil, NR-18 requires the daily crane and hoist inspection and the scaffold release to be recorded. Excavation shoring is inspected every day — and the standard does not require a record .

Risk programme and records

  • Prior Works Notice in the SIT system before starting (NR-18, 18.3.1, b))
  • Risk programme drawn up by a legally qualified safety professional (NR-18, 18.4.2)
  • History of the risk inventory kept 20 years (NR-01, 1.5.7.3.3.1)
  • NR documents accepted in digital form with an ICP-Brasil certificate (NR-01, 1.6.2)

Recorded inspections

  • Lifting equipment: daily inspection carried out and recorded (NR-18, 18.10.1.32)
  • Hoist: the operator records the daily check before work starts (NR-18, 18.11.7, d))
  • Scaffold: release for use recorded and signed by a qualified professional (NR-18, 18.12.4)
  • Fall-arrest system: initial and periodic (≤12 months) inspections recorded (NR-35, 35.6.6.3 e 35.6.6.4)

Checked, not recorded

  • Excavation shoring inspected daily (NR-18, 18.7.2.11)
  • Safety nets inspected weekly (NR-18, 18.9.4.4.5)
  • In neither case does the standard require a record
  • Routine fall-arrest checks are only recorded when a component is rejected (NR-35, 35.6.6.4)

Who answers for the works

  • Every engineering works or services contract is subject to an ART (Lei 6.496/1977, art. 1º)
  • The ART names, for legal purposes, who is technically responsible (Lei 6.496/1977, art. 2º)
  • Public works: the inspector logs every occurrence in a dedicated record (Lei 14.133/2021, art. 117, § 1º)
  • CONFEA Livro de Ordem repealed: the site diary is up to the company (Res. CONFEA 1.140/2023, art. 1º)

From street to management system, in four moves

It's the same sequence in all four domains, whether a safety inspection, a works audit or the periodic check of a harness.

Capture

In the field, on the phone, with or without a connection. What is not captured on the spot gets rebuilt from memory, hours later, back at the office.

Evidence it

Photo marked up and captioned, signature identified, time and coordinates, tied to the item they evidence instead of bundled in at the end.

Handle

The nonconformity leaves the field already with type, priority, due date, owner and a 5W2H action plan.

Deliver

Dashboard for management, report in your branding, and the process opened inside the management system , yours or your client's.

What the inspection subject can be

A work front, a network asset, equipment or PPE with its holder, a material batch. Each with its own record and accumulated history, instead of a loose document per check.

The rule is in the model

Conditionals, weights, severity, mandatory evidence, calculated items and exit rule. The same inspection gives the same result with any technician.

The finding has a flow

From finding to proven closure, with a trail of who did what and when. Where there is SoftExpert, the process opens inside it by native integration .

The whole inspection fits on the phone

Checklist selection
Checklist selection
Checklist sections
Checklist sections
Item response
Item response
Photo markup
Photo markup

Evidence that holds up in an audit

One work-site inspection produces dozens of photos. Whoever opens them a year from now has to see, unaided, what each one evidences.

Mark and caption

Free pen in six colours over the image itself, captioned at the moment of the inspection.

The mark survives the PDF

What was drawn on the phone enters the document as a numbered table, tied to the evidence number and to the answer that raised it.

Photo markup
Photo markup
In the report
In the report

No inspection closes half-finished

The system counts what is missing and says who has to sign. Usually two people: the inspector and whoever answered for the work front.

Open items in view

Unanswered questions, mandatory fields left blank, pending result and missing signature, counted by the system before it lets you close.

Signature with context

Name, e-mail, ID document and location captured at the moment of signing.

Calculated result

Score and rating applied by the model's rule, identical across every site and every crew.

Only then, closed

No open items and no missing signatures. Until then the inspection stays in progress, visible to whoever ordered it.

Checklist data and pending items
Checklist data and pending items
Signature with location
Signature with location

From checklist to certificate, with nothing to write up afterwards

The certificate and the technical sheet come from the same checklist the team filled in on site. What was answered, photographed and signed becomes the final document, in the company template.

Answer

Each item with its answer, numbered evidence and who answered.

Conclude

The conclusion and the issues go into the document, with category and description.

Sign

The inspector's signature, with date, time and location.

Issue

Certificate or technical sheet in the company template, with instance number and revision.

The certificate comes from the checklist

Nobody copies answers into a separate document. What is in the certificate is what was recorded on site.

One checklist, several documents

Report, certificate and technical sheet from the same answers, each in its own template.

No stray versions

Instance number and revision on every page: the client always knows which certificate they received.

Your inspection standard, applied the same by every crew

What today depends on the inspector's experience becomes a rule in the system, the same on every front and with any technician.

Conditional answers

The inspection first asks the conditions of the work front: height, excavation, lifting. Only then does it show what applies. That is what makes the "not applicable" answers disappear.

Weights and scoring

Each item is worth what it has to be worth, so the score reflects how critical the failure was rather than item count.

Calculated items

Formulas that combine answers and return the result on the spot, with no side maths.

Score evaluation

Rating bands that you define, applied automatically when the inspection closes.

Answer severity

A single critical item, such as missing PPE, fails the whole inspection.

Validation rules

Minimum and maximum ranges, mandatory evidence and justification, checked on the device.

The rule alerts instantly
The rule alerts instantly

The nonconformity leaves the field with an owner and a date

Finding the nonconformity is the start. What the operator charges for, and what you sell, is the record that someone closed it on time.

Opens on site

The noncompliant item opens the issue during the inspection, with the photo, the place and who found it.

Classifies

Type, priority and due date set by the process rule, the same on any front.

Handles

Named owner, 5W2H action plan, controlled deadline and automatic chasing.

Evidence

Auditable timeline: who did what, when, and with what evidence attached.

Nothing waits for someone to remember

Deadlines coming due, issues with no owner and overdue actions show on the dashboard and in the alert before the client asks.

Occurrences in the panel
Occurrences in the panel

Expand your ecosystem

The field record enters SoftExpert as a process

Native SoftExpert integration

Smart apps and SoftExpert have partnered for over twenty years. The integration is native, built by people who work on both sides, not a connector bolted on from outside.

  1. 01

    Mobile execution

    Inspection or audit completed on the phone, with evidence, answers and item context.

  2. 02

    Server orchestration

    SmartApp receives the closure, validates the package and prepares the integration send.

  3. 03

    Integration queue

    Async processing with status, retry and history for every submission.

  4. 04

    SoftExpert workflow

    Opens or updates the native SoftExpert process — no file export/import.

  5. 05

    Occurrences and actions

    Deviations follow the existing nonconformity flow, with evidence and owner.

  6. 06

    Dashboards, portals and reports

    Management follow-up, synced checklist portal and report attached to the process.

SmartApps Checklist no celular — dados do checklist
SmartApp
SoftExpert no notebook — workflow e fluxograma
SoftExpert

The record is already inside SoftExpert

Follow-up portal, answer grids, deviation with evidence and history for every send — in SoftExpert.

Follow-up portal
Follow-up portal
Deviation with evidence
Deviation with evidence

Every occurrence type has a workflow of its own

You create the occurrence types yourselves, and each one carries its own workflow. Below are four examples, not a closed list: a support ticket and an audit nonconformity are not handled the same way.

Nonconformity

Record · Root cause · Actions · Effectiveness check

Environmental anomaly

Record · Handling · Approval · Effectiveness check

Improvement opportunity

Record · Analysis · Actions

Support ticket

Record · Handling · Closure

Steps are assembled, not imposed
Steps are assembled, not imposed

From root cause to a verified close

This is where a digitised inspection parts ways with a good-looking report: the finding gets a method of analysis, a plan with an owner and a deadline, and a check that confirms the result.

Cause, not symptom
Cause, not symptom
Action plan with schedule
Action plan with schedule

Reports, inspection certificates and technical sheets, with your branding

The same checklist produces the document each reader needs: a report for management, a certificate for the end client and the asset technical sheet for the auditor. Nobody puts anything together in a rush the day before.

Report, certificate or technical sheet

Each document type has its own template: fields, order, logo and visual identity. You pick the template; nobody assembles the document by hand.

Numbered, traceable evidence

Each photo has its own number, linked to the item that required it, with who answered, date, time and coordinates.

Log of issues raised

Nonconformities listed at the end, with category and description, ready for the end client and the auditor.

Instance and revision in the footer

Every report carries the instance number and the revision on each page. No doubt about which version the client received.

Checklist report and verification sheet from the same checklist
Checklist report and verification sheet from the same checklist

The whole process in five steps

Dedicated features for every need.

01

Design the checklist

  • Your own checklists

    Sections, items, weights and rules from your standard

  • Conditional answers

    The right question at the right moment

  • Validation rules

    Limits, mandatory fields and blocking

  • Calculated items

    Formulas solved by the system

02

Run it in the field

  • Web and mobile execution

    Offline by default, on iOS and Android

  • Complete evidence

    Photo, audio, video, signature and GPS

03

Score and rate

  • Weights and scoring

    The score reflects real criticality

  • Score evaluation

    Rating bands applied automatically

  • Answer severity

    A critical item fails the whole set

04

Handle the deviation

  • Configurable handling workflows

    A workflow of its own for each occurrence type

  • Root-cause analysis tools

    Ishikawa 6M, with the root cause flagged

  • Action plan and effectiveness

    5W2H and effectiveness check with evidence

05

Govern and integrate

  • SoftExpert integration

    Native, with governance and history

  • Customisable reports and inspection certificates

    With issues, images and your company branding

  • Spreadsheet import

    Initial load with no typing

  • Users and crews

    Scope and permissions by profile

  • Traceability and audit

    A complete trail of who did what