Equipment inspector with a tablet by piping in a refinery unit

Inspection and Audits for Refinery Maintenance

In a refinery, maintenance never stops: rounds follow pumps, compressors and exchangers in continuous operation, equipment inspection tracks thickness and due dates for vessels and piping, and the turnaround packs thousands of jobs, with contractors, work permits and handovers to check before start-up.

From unit rounds to the turnaround, every check in a single app

In a refinery, maintenance never stops: rounds follow pumps, compressors and exchangers in continuous operation, equipment inspection tracks thickness and due dates for vessels and piping, and the turnaround packs thousands of jobs, with contractors, work permits and handovers to check before start-up.

01

Unit routine

  • Rounds on pumps, compressors and turbines
  • Vibration, temperature and lubrication
  • Leaks, insulation and coating
  • Instruments, alarms and interlocks

02

Equipment inspection

  • Vessels, columns and exchangers
  • Piping: thickness, corrosion and supports
  • Relief valves and test due dates
  • Furnaces, boilers and storage tanks

03

Planned turnaround

  • Hot and cold work permits
  • Confined space: gas test and attendant
  • Lockout, blinds and line isolation
  • Scaffolds, lifting and contractors

04

Handover and start-up

  • Hydrostatic and leak tests
  • Management of change after repair
  • Pre-start-up safety review
  • Punch list and return to operations

In the refinery, evidence follows the equipment

If an auditor asked today for a pressure vessel's last inspection and the permit for the work done on it, how long would your team take to find them? With Smart apps, every check is recorded against the equipment, with photos, time and the person in charge, ready to be looked up.

The asset is the unit

Thickness readings, internal inspection, relief valve testing. Everything checked belongs to an identified asset and has to be recorded with it.

The turnaround packs it all

Weeks of work, hundreds of contractors and thousands of permits. Every handover has to be written down, with time, gas reading and owner.

Start-up needs sign-off

Leak test done, blinds removed, instruments tested. An open item with no record is equipment that cannot go back into service.

History is per asset

Equipment inspection sets the next due date, reliability looks for the failure cause and the auditor checks the equipment file. Each request is different, and all must come from each asset's record.

Inspector measures piping thickness with an ultrasonic gauge in a refinery unit
Inspector measures piping thickness with an ultrasonic gauge in a refinery unit
Maintenance crew opens a heat exchanger during a planned turnaround
Maintenance crew opens a heat exchanger during a planned turnaround

What happens after the finding is written down

Recording the issue is the easy part and almost everyone already does it. What fails is what comes next: who handles it, by when, with what evidence, and how anyone knows it will not come back.

The record arrives late

The round is jotted on a clipboard sheet and typed into the maintenance system days later. Nobody looks again at the pump's high vibration at six.

The action has no owner

The turnaround punch item sits in a contractor spreadsheet or an email to planning. With no owner and no deadline, the equipment goes back into service with it open.

Nobody chases the deadline

Chasing depends on someone remembering to go and check. Usually they remember the day the client asks.

The close has no evidence

Saying it was resolved is easy. Showing the state before, the action taken and the state after is another matter.

Nobody knows what repeats

With no recorded cause, the same corrosion under insulation turns up in three units and counts as three unrelated incidents.

Management asks and waits

Which assets are overdue for inspection, in which unit and for how many days. The answer is in inspector reports and turnaround folders.

Paper work permit on a clipboard next to a gas detector
Paper work permit on a clipboard next to a gas detector

The law requires from round to turnaround

In Brazil, refineries have their own ANP safety management rules: documented mechanical integrity, filed work permits and change records kept 5 years; NR-13 extends intervals for certified in-house inspection.

Mechanical integrity

  • Inspection, testing and maintenance plans and procedures for mechanical integrity (ANP Res. 5/2014)
  • Every mechanical integrity activity documented at the facility (ANP Res. 5/2014)
  • Implementation of inspection report recommendations is tracked (ANP Res. 5/2014)
  • Documented inspection and maintenance plan, on forms or in a system (NR-20, 20.10.1)

Vessels, boilers and piping

  • With SPIE (in-house inspection), Category I vessels: external 3 years, internal 6 (NR-13, 13.5.4.5)
  • With certified inspection and risk-based inspection, Category I internal up to 10 years (NR-13, 13.5.4.5.1)
  • Piping with an inspection programme and plan by fluid, pressure, temperature and damage (NR-13)
  • Piping inspection report with minimum content, name and signature of the qualified engineer (13.6.2.5)

Turnaround and work permits

  • Work permits for confined space, isolation, hot work and line opening (ANP Res. 5/2014)
  • Work permits filed 15 days on paper and ≥ 3 months in an electronic system (ANP Res. 5/2014)
  • Confined space entry permits filed for 5 years (NR-33, 33.5.9)
  • Lockout tag shows date, time, reason for maintenance and person in charge (NR-12, 12.11.3, b))

Change and contractors

  • Hazards of a change assessed before it is implemented (ANP Res. 5/2014)
  • Management of change documented and filed for at least 5 years (ANP Res. 5/2014)
  • Contractor performance evaluated periodically, with results recorded (ANP Res. 5/2014)
  • The host company's risk programme includes prevention measures for contractors (NR-01, 1.5.8.1)

From street to management system, in four moves

It's the same sequence in all four domains, whether a safety inspection, a works audit or the periodic check of a harness.

Capture

In the field, on the phone, with or without a connection. What is not captured on the spot gets rebuilt from memory, hours later, back at the office.

Evidence it

Photo marked up and captioned, signature identified, time and coordinates, tied to the item they evidence instead of bundled in at the end.

Handle

The nonconformity leaves the field already with type, priority, due date, owner and a 5W2H action plan.

Deliver

Dashboard for management, report in your branding, and the process opened inside the management system , yours or your client's.

What the inspection subject can be

A work front, a network asset, equipment or PPE with its holder, a material batch. Each with its own record and accumulated history, instead of a loose document per check.

The rule is in the model

Conditionals, weights, severity, mandatory evidence, calculated items and exit rule. The same inspection gives the same result with any technician.

The finding has a flow

From finding to proven closure, with a trail of who did what and when. Where there is SoftExpert, the process opens inside it by native integration .

The whole inspection fits on the phone

Checklist selection
Checklist selection
Checklist sections
Checklist sections
Item response
Item response
Photo markup
Photo markup

Evidence that holds up in an audit

One work-site inspection produces dozens of photos. Whoever opens them a year from now has to see, unaided, what each one evidences.

Mark and caption

Free pen in six colours over the image itself, captioned at the moment of the inspection.

The mark survives the PDF

What was drawn on the phone enters the document as a numbered table, tied to the evidence number and to the answer that raised it.

Photo markup
Photo markup
In the report
In the report

No inspection closes half-finished

The system counts what is missing and says who has to sign. Usually two people: the inspector and whoever answered for the work front.

Open items in view

Unanswered questions, mandatory fields left blank, pending result and missing signature, counted by the system before it lets you close.

Signature with context

Name, e-mail, ID document and location captured at the moment of signing.

Calculated result

Score and rating applied by the model's rule, identical across every site and every crew.

Only then, closed

No open items and no missing signatures. Until then the inspection stays in progress, visible to whoever ordered it.

Checklist data and pending items
Checklist data and pending items
Signature with location
Signature with location

From checklist to certificate, with nothing to write up afterwards

The certificate and the technical sheet come from the same checklist the team filled in on site. What was answered, photographed and signed becomes the final document, in the company template.

Answer

Each item with its answer, numbered evidence and who answered.

Conclude

The conclusion and the issues go into the document, with category and description.

Sign

The inspector's signature, with date, time and location.

Issue

Certificate or technical sheet in the company template, with instance number and revision.

The certificate comes from the checklist

Nobody copies answers into a separate document. What is in the certificate is what was recorded on site.

One checklist, several documents

Report, certificate and technical sheet from the same answers, each in its own template.

No stray versions

Instance number and revision on every page: the client always knows which certificate they received.

Your inspection standard, applied the same by every crew

What today depends on the inspector's experience becomes a rule in the system, the same on every front and with any technician.

Conditional answers

The inspection first asks the type of job: round, equipment inspection, hot work or confined space. Only then does it show what applies. Each task sees only its own questions.

Weights and scoring

Each item is worth what it has to be worth, so the score reflects how critical the failure was rather than item count.

Calculated items

Formulas that combine answers and return the result on the spot, with no side maths.

Score evaluation

Rating bands that you define, applied automatically when the inspection closes.

Answer severity

A single critical item, such as missing PPE, fails the whole inspection.

Validation rules

Minimum and maximum ranges, mandatory evidence and justification, checked on the device.

The rule warns on the spot
The rule warns on the spot

The nonconformity leaves the field with an owner and a date

Finding the nonconformity is the start. What the operator charges for, and what you sell, is the record that someone closed it on time.

Opens on site

The noncompliant item opens the issue during the inspection, with the photo, the place and who found it.

Classifies

Type, priority and due date set by the process rule, the same on any front.

Handles

Named owner, 5W2H action plan, controlled deadline and automatic chasing.

Evidence

Auditable timeline: who did what, when, and with what evidence attached.

Nothing waits for someone to remember

Deadlines coming due, issues with no owner and overdue actions show on the dashboard and in the alert before the client asks.

Issues on the dashboard
Issues on the dashboard

Expand your ecosystem

The field record enters SoftExpert as a process

Native SoftExpert integration

Smart apps and SoftExpert have partnered for over twenty years. The integration is native, built by people who work on both sides, not a connector bolted on from outside.

  1. 01

    Mobile execution

    Inspection or audit completed on the phone, with evidence, answers and item context.

  2. 02

    Server orchestration

    SmartApp receives the closure, validates the package and prepares the integration send.

  3. 03

    Integration queue

    Async processing with status, retry and history for every submission.

  4. 04

    SoftExpert workflow

    Opens or updates the native SoftExpert process — no file export/import.

  5. 05

    Occurrences and actions

    Deviations follow the existing nonconformity flow, with evidence and owner.

  6. 06

    Dashboards, portals and reports

    Management follow-up, synced checklist portal and report attached to the process.

SmartApps Checklist no celular — dados do checklist
SmartApp
SoftExpert no notebook — workflow e fluxograma
SoftExpert

The record is already inside SoftExpert

Follow-up portal, answer grids, deviation with evidence and history for every send — in SoftExpert.

Tracking portal
Tracking portal
Finding with evidence
Finding with evidence

Every occurrence type has a workflow of its own

You create the occurrence types yourselves, and each one carries its own workflow. Below are four examples, not a closed list: a support ticket and an audit nonconformity are not handled the same way.

Nonconformity

Record · Root cause · Actions · Effectiveness check

Environmental anomaly

Record · Handling · Approval · Effectiveness check

Improvement opportunity

Record · Analysis · Actions

Support ticket

Record · Handling · Closure

The stages are assembled, not imposed
The stages are assembled, not imposed

From root cause to a verified close

This is where a digitised inspection parts ways with a good-looking report: the finding gets a method of analysis, a plan with an owner and a deadline, and a check that confirms the result.

Cause, not symptom
Cause, not symptom
Plan with a schedule
Plan with a schedule

Reports, inspection certificates and technical sheets, with your branding

The same checklist produces the document each reader needs: a report for management, a certificate for the end client and the asset technical sheet for the auditor. Nobody puts anything together in a rush the day before.

Report, certificate or technical sheet

Each document type has its own template: fields, order, logo and visual identity. You pick the template; nobody assembles the document by hand.

Numbered, traceable evidence

Each photo has its own number, linked to the item that required it, with who answered, date, time and coordinates.

Log of issues raised

Nonconformities listed at the end, with category and description, ready for the end client and the auditor.

Instance and revision in the footer

Every report carries the instance number and the revision on each page. No doubt about which version the client received.

Checklist report and verification sheet from the same checklist
Checklist report and verification sheet from the same checklist

The whole process in five steps

Dedicated features for every need.

01

Design the checklist

  • Your own checklists

    Sections, items, weights and rules from your standard

  • Conditional answers

    The right question at the right moment

  • Validation rules

    Limits, mandatory fields and blocking

  • Calculated items

    Formulas solved by the system

02

Run it in the field

  • Web and mobile execution

    Offline by default, on iOS and Android

  • Complete evidence

    Photo, audio, video, signature and GPS

03

Score and rate

  • Weights and scoring

    The score reflects real criticality

  • Score evaluation

    Rating bands applied automatically

  • Answer severity

    A critical item fails the whole set

04

Handle the deviation

  • Configurable handling workflows

    A workflow of its own for each occurrence type

  • Root-cause analysis tools

    Ishikawa 6M, with the root cause flagged

  • Action plan and effectiveness

    5W2H and effectiveness check with evidence

05

Govern and integrate

  • SoftExpert integration

    Native, with governance and history

  • Customisable reports and inspection certificates

    With issues, images and your company branding

  • Spreadsheet import

    Initial load with no typing

  • Users and crews

    Scope and permissions by profile

  • Traceability and audit

    A complete trail of who did what

Take digital to the field. Bring the evidence back.

Contact

Book a conversation

SmartApp for Refineries

Tell us about the operation. We will follow up with the best evaluation path.